Water Treatment Improvements
Camano Sunset Community Association | Camano Island, WA
The Camano Sunset Community Association’s (CSCA) water treatment system had reached the end of its design life and was failing. High iron and disinfection by-products (DBPs) were affecting water quality, and other treatment processes were also beginning to fail.
Funding the Solution
We prepared a Preliminary Engineering Report (PER) to support CSCA’s USDA Rural Development loan application. The work included a system evaluation, a capacity analysis, and a hydraulic model to identify deficiencies and recommend capital improvements. The PER gave CSCA a clear basis for funding eligibility, with prioritized improvements and long-term system needs that support reliable operations and regulatory compliance.
Designing the Fix
Ammonia in the water prevented effective contaminant removal and contributed to DBP formation. We designed a biological ammonia removal system to address the problem at its source.
Results
$495,000 USDA Rural Development grant and loan package awarded
$194,000 of the package (about 39%) is grant funding
Permitting and bidding complete
Construction currently underway
Services: System Evaluation | Capacity Analysis | Hydraulic Modeling | Preliminary Engineering Report | USDA Funding Support | Treatment System Design | Permitting and Bidding
Client Reference: Jenny Joyce, President, Camano Sunset Community Association )
New Water & Pre-Treatment Wastewater System
New Water & Pre-Treatment Wastewater System
Prestage Foods | Eagle Grove, IA
In 2017, Prestage Foods announced plans for a new 700,000 square-foot pork processing plant, set to open in early 2019. Before opening, the facility needed its own water system and a wastewater pre-treatment system to discharge to the City of Eagle Grove’s wastewater treatment facility.
Water Supply and Treatment
We designed, permitted, and oversaw construction of two 2,000 gallon per minute (GPM) Jordan Aquifer wells, each about 1,980 feet deep. We paired them with a 2,000 GPM treatment system that includes filtration, reverse osmosis, and polishing softeners. We also assisted with the design of the wastewater pre-treatment system.
Phase 2: Expansion
In 2024, Prestage Foods asked to expand the system for additional supply and storage backup. We designed a 1.5-million gallon ground storage reservoir and a Mississippian Aquifer well to provide supplemental supply when other wells are down for maintenance. The new well can also be converted to a Jordan Aquifer well if the facility decides to in the future. Phase 2 is scheduled for completion before 2027.
Project Highlights
Two 2,000 GPM Jordan Aquifer wells, about 1,980 feet deep
2,000 GPM filtration, reverse osmosis, and polishing softener treatment system
Wastewater pre-treatment design assistance for discharge to the City of Eagle Grove
1.5-million gallon ground storage reservoir
Mississippian Aquifer well, convertible to a Jordan Aquifer well
Services: Water Supply | Treatment | Storage | Distribution | Wastewater Pre-Treatment | Industrial
Client Reference: Jere Null, Chief Operating Officer